FAQs

This con­tent has been writ­ten col­lab­o­ra­tive­ly by the Project Part­ners of Alice Springs Future Grid, led by the Intyal­heme Cen­tre for Future Ener­gy. Please sub­mit your ques­tions, which will be answered in due course and shared on this plat­form if rel­e­vant and appro­pri­ate. You will be noti­fied via email when the answer is post­ed. Terms and con­di­tions are detailed on the sub­mit a ques­tion page. Fur­ther FAQs specif­i­cal­ly about the Solar Con­nect Vir­tu­al Pow­er Plant tri­al are addressed in this doc­u­ment

Can’t find what you’re after? Send us a question!


Are outstation stand-alone power systems part of the 50% by 2030 renewable energy target?

Microgrids, or stand-alone power systems, overseen by IES (Indigenous Essential Services) have a target of 70% by 2030.

IES is a subsidiary of Power and Water Corporation. It services 72 remote communities and 66 outstations across the NT. In total there are 430 homelands and outstations in the NT. 130 renewable energy systems were installed by Bushlight, with many more funded through other programs. This means there will be renewable energy generated which is not counted in the target, but the amount is fairly limited.

If I get an electric vehicle (EV) do I need 3-phase power at my house to charge it? How much does it cost to charge each day?

You don’t need 3-phase power to charge an EV. In fact, you can purchase charging cables that plug into a standard domestic socket. The most common way to charge an EV is via a "type 2" charger, and many EV drivers will opt to have a charging point installed in their home. A 3-phase connection will charge your car more quickly. A single phase type 2 connection will be slower than 3-phase but faster than your standard household sockets. Your local solar installer or electrician can assist with questions specific to your case. The cost of the charge will depend on the general cost of electricity, the capacity of the vehicle’s batteries, and whether you’re incorporating solar power. A fuel cost savings calculator can be found on myelectriccar.com.au, with plentiful similar resources available elsewhere online.

Are there charging stations along the Stuart Highway to Adelaide and Darwin? Are they fast chargers?

There are enough chargers along the highway to comfortably travel the length of Australia. There are a surprising number of charging points all over Australia, including in some incredibly remote locations, such as Kiwirrkurra, which is one of the most remote settlements on the planet! It is easy to view the full range of charging points on the app PlugShare.

Is it better for everyone to go fully off grid?

Many people in the Northern Territory rely upon off-grid power systems, especially in very remote settlements such as outstations and ranger stations. The Alice Springs grid provides interesting challenges because it is isolated, unlike the National Electricity Market which connects jurisdictions from Queensland to South Australia, including Tasmania. The more customers and generators that are connected to a grid, the fewer challenges are faced in maintaining grid stability. Therefore, removing yourself from the grid when you have the choice to be connected is not of any benefit to the community.

Can I go fully off-grid in town? What will it cost me?

With solar PV and batteries it is technically possible to go off-grid, but Alice Springs residents would need a very big battery or backup diesel generator to cover occasions where there is limited sun for consecutive days. The most common option is to install PV and BESS in proportion to household needs, and let the grid come to the rescue when its needed. In the future, plentiful PV and BESS will create a very resilient system, because it’s highly unlikely that they could all fail at once. For most people it is not financially viable to go off-grid, but as centralised energy generation incorporates a growing proportion of renewables, it means everyone will eventually be provided with cleaner energy.

How will lessons learnt in the project be used in the future? And by whom?

Knowledge sharing is a key focus for (funding agency) ARENA, and the Future Grid project has a prominent knowledge sharing plan, delivery of which is led by CSIRO. Reports generated through the project are hosted on the ARENA Project Page for Future Grid. It is recognised that lessons learnt in Alice Springs can be scaled-up and applied to other grids, such as the Darwin-Katherine Interconnected System (DKIS) and the National Electricity Market on Australia’s East Coast. The project’s main target audience is industry and government, so it is expected these entities will be the primary conduit through which lessons learnt in Alice Springs are applied elsewhere.

At a national and global level, how important is the Alice Springs Future Grid project and what outcomes might be applicable to other grids?

The Future Grid project (and the Roadmap to 2030) has significant value nationally because some of the research and findings demonstrated in the Roadmap, set out ways different parts of the power system will need to work together in the future. A key characteristic of Alice Springs is that it is small enough that the opportunity exists to test and validate interventions, but big enough that the results have direct applicability across a range of different systems and grids in Australia. To this end, Alice Springs is sometimes said to be “small enough to manage but big enough to matter”.

What is the project’s position on vehicle-to-grid technology and electric vehicles in general?

The Future Grid car was an electric vehicle (a Nissan Leaf) and there were individuals in the team and community who were highly enthused about this technology. However, operating within a constrained budget and timeline, electric vehicles or related trials were not considered as part of the project. The team designed a series of interdependent activities that served to consider immediate issues in the system and support further renewable energy penetration into the Alice Springs grid in a cost-effective and realistic way. These interventions made use of and optimise existing grid infrastructure, which is a valuable public asset. The Future Grid team always welcomed any future or parallel projects that supported the increased use of electric vehicles in Alice Springs or focused on the integration of this technology as another means of supporting the grid.